On the 5th of October 2004 our MV “UBC Stavanger” with hull no SH-1131 was successfully delivered by Saiki Heavy Industries in Japan to Mastermind Shipmanagement Ltd.

Captain Dobrzynski and Chief Engineer Dworzynski had the honour to take the ship out of the shipyard. The vessel has already entered the UNC Pool and will be trading within the Americas.